Ez-plans can undertake site surveys prior to any proposed works and designs being undertaken.
Site surveys are carried out using a laser total station which co-ordinates
the site into a grid and gives all the features an x,y,z co-ordinate.
All existing features are pickedup and turned into an AutoCAD drawing.Ground levels are recorded at suitable spacings to enable the side to
be contoured.
This information can also be used to evaluate the volume of materials to be dug out or removed from a site by creating a digital terrain model. Cut and fill values can be calculated to any proposed site datum and longitudinal sections generated automatically.
Site Setting OutAny proposed site details can be given to our surveyor and he will set out the proposed building, features, etc using the total station instrument. We use this technique to set out corners of brickwork, centre of dig and more recently, the accurate position for the sole plates of timber frame buildings to sit on.
The only information needed to undertake this task is 2 existing site stations (must have x,y,z values) and a geo-referenced site drawing. This can be to a local grid or be to the Ordnance Surveys mapping grid.
Section 104 Public Sewer Diversion designs to Southern Water Services specificationOur design team have the necessary experience to design a public sewer diversion to satisfy Southern Water Services approval. This entails all details being to the standard of 'Sewers to Adoption 6th Addition.'
Designs will include typical manhole details, longitudinal sections of the proposed pipework, manhole schedules and location plans coloured accordingly.
Plan PrintingPlan printing is a service we offer independently. If you require prints from A4 up to A0 size, we can produce this for you using our colour plotter. Contact us for pricing details and acceptable file formats.
3D Models for Proposed Developments
20-20 Project, Maidstone, Kent.
Industrial units on going through a re-development. Enlarging and modernizing.
Click images to enlarge view.
